Construction

Construction workflow: from bid to closeout

How to use DocumentLane at each stage of a project.

Prequalification (before bid)

Send the portal link with your prequalification requirement set. Review the submitted documents before deciding which subcontractors can bid.

Award and mobilisation

Ask for the signed subcontract, site-specific insurance and safety plan. Use e-signatures so nothing waits on a courier.

During the project

Watch the Expirations page weekly. Subcontractors get reminders 30 and 7 days before a COI or WCB clearance expires, and their status returns to In Progress if a document lapses — a clear signal not to release payment.

Collecting and correcting documents

Open the subcontractor's page to copy their portal link or document inbox address. Their invitation email includes both a code and a link, using subcontractor terminology. The upload page remains the client portal.

Use an Information form requirement for structured prequalification answers. For a Contract requirement, the subcontractor chooses Review & sign, then your team countersigns in Documents. Both parties can download the completed PDF. Requesting changes makes Review & sign available again.

Deadlines and archived subcontractors

Set an optional onboarding deadline when adding or editing a subcontractor. It appears beside outstanding requirements in the portal; it is separate from insurance expiry dates.

Search Subcontractors by name, contact, email, reference or industry. Archive inactive records and use Include archived to find or restore them. Archived subcontractors cannot be selected for new project assignments; existing assignments remain.

Closeout

Export the documents list as a spreadsheet for your project file, and use the Audit log to show who approved what and when.